LMU GERSTEN

HBA performed the Gymnasium renovation including, new concrete slab on metal deck and  infills of existing concrete wall openings to match existing sand blast finishes. Exterior site concrete flatwork with alternating topcast finish, seat and monument walls with topcast finish and a new elevated concrete ramp with topcast finish.