VILLA SIENA SETTLEMENT
HBA performed a partial pool deck replacement and new CMU retaining wall furnished with precast cap. The existing site was settling causing the existing wall to lead away from the poll and a portion of the concrete pool deck to slope dramatically toward the wall.














